Short answer: Read a landscaping estimate line by line, not by its total. Each line should name the material, quantity, unit and price, and you can check quantities yourself: one cubic yard of mulch covers 108 sq ft at 3 inches. Then read the terms: deposit, payment schedule, change orders, cancellation rights and lien releases, several of which state law caps.
$1,000 or 10% whichever is less: the most a California contractor may take as a down payment (Cal. Bus. & Prof. Code 7159.5)
1/3 of the contract price: Maryland’s cap on a home improvement deposit (Md. Bus. Reg. 8-617)
3 business days to cancel a sale of $25 or more signed at your home (FTC Cooling-Off Rule, 16 CFR 429)
108 sq ft covered by 1 cubic yard of mulch at 3 inches deep (UF/IFAS Extension)
A landscaping estimate is two documents stapled together. The first is a bill of materials and hours: what goes into your yard and how long it takes to put it there. The second is a set of terms: when you pay, what happens when plans change, and who can put a claim on your house if a supplier goes unpaid. Most guides cover the first half and skip the second, which is where homeowners actually lose money.
This page walks through a sample estimate for a modest backyard job, line by line, with a note on each line saying what to check. Then it covers the arithmetic for checking quantities, the payment and cancellation rules that state law sets, and the lien paperwork that should change hands before you write the last check. If you are still collecting bids, start with our guides to hiring a landscaper.
A sample landscaping estimate, annotated line by line
The project: a 12 x 16 ft concrete paver patio, a 300 sq ft planting bed with 8 shrubs and 20 perennials, and 400 sq ft of new sod, all replacing a worn lawn. The estimate below is an illustration we built, not a real contractor’s bid. Every material price is a published 2026 supply-yard price (linked in the notes and sources), the labor rate sits inside the range federal wage and revenue data support, and the quantities follow from the coverage rates explained further down. Real estimates will differ in format and price; the point is what each line should tell you.
Swipe the table sideways to see every column.
| Line item (as written on the estimate) | Quantity x unit price | Total | What to check |
|---|---|---|---|
| Site prep | |||
| 1. Strip existing lawn with sod cutter; haul debris | 892 sq ft (labor in line 16 and 17) | Included | The area should add up: patio 192 + bed 300 + new lawn 400 = 892 sq ft. If the bid strips more than the work area, ask why. |
| 2. Excavate patio area to 7.4 in. | 211 sq ft, 12 ft 8 in. x 16 ft 8 in. (labor in line 16) | Included | Depth = 2 3/8 in. paver + 1 in. sand + 4 in. base. The dig is 4 in. wider than the patio on each side because the base must extend past the edge restraint (CMHA PAV-TEC-003). |
| Hardscape materials | |||
| 3. Crushed stone base, 4 in. compacted | 4.5 cu yd x $59.00 | $265.50 | A yard of crusher run covers about 100 sq ft at 2 in. (Cummin Landscape Supply), so 50 sq ft at 4 in.: 211 / 50 = 4.2 cu yd. A bid with no base depth written down is the first thing to fix. |
| 4. Bedding sand, 1 in. | 1 cu yd x $64.99 | $64.99 | 192 / 324 = 0.6 cu yd, rounded up to the 1 cu yd unit the yard sells (Texas Garden Materials). It should be concrete sand; CMHA says stone dust should not be used (PAV-TEC-002). |
| 5. Concrete pavers, 4 x 8 Holland, 60 mm | 2 pallets x $539.00 | $1,078.00 | A pallet covers 120 sq ft (Cummin). 192 sq ft needs 1.6 pallets, so 48 sq ft (25 percent) is surplus. Ask whether the leftover is yours or credited. |
| 6. Edge restraint and spikes | 8 rails x $12.00 + 56 spikes x $0.60 | $129.60 | 56 ft of perimeter; 8 rails of 7 ft 8 in. = 61 ft (Cummin). Flat landscape edging is not an acceptable paver restraint (CMHA). |
| 7. Polymeric joint sand | 3 bags x $41.00 | $123.00 | One 50 lb bag fills 65 to 85 sq ft of narrow joints on 2 3/8 in. pavers (Alliance Gator spec): 2.3 to 3.0 bags. |
| Softscape materials | |||
| 8. Screened topsoil, 4 in. under new lawn | 5 cu yd x $55.00 | $275.00 | 400 x 4 / 324 = 4.9 cu yd (MK Landscape Supply 2026 price). |
| 9. Sod, St. Augustine ‘Raleigh’ | 1 pallet (450 sq ft) x $240.00 | $240.00 | Lawn is 400 sq ft; the pallet leaves 50 sq ft for cuts (Texas Garden Materials). The species should be named. |
| 10. Hardwood mulch, 3 in. | 3 cu yd x $50.00 | $150.00 | 300 / 108 = 2.8 cu yd (UF/IFAS). Fine wood mulch should be no more than 2 to 3 in. deep (Clemson HGIC 1604); 5 cu yd here would be a red flag. |
| 11. Shrubs, 5-gallon (species listed) | 8 x $45.00 | $360.00 | Species and container size on every plant line. 2026 nursery lists run $26.75 to $99.99 for 5-gallon plants (Nevada Division of Forestry; Corliss Brothers). |
| 12. Perennials, 1-gallon (species listed) | 20 x $15.00 | $300.00 | Same lists: $10.75 to $27.99 per 1-gallon pot. |
| Logistics | |||
| 13. Delivery | 3 loads x $75.00 | $225.00 | Stone and sand, soil and mulch, sod. A county yard charges $75 within 10 miles (Orange County, NC); sod farms charged $75 to $450 a delivery (USDA AMS, Q2 2026). |
| 14. Skid steer | 2 days x $336.11 | $672.22 | New York State’s contract day rate for a small skid steer (NY OGS contract 72007-23182). If there is also a ‘mobilization’ or ‘trip’ line, ask what it covers. |
| 15. Dump fees | 9 cu yd x $10.00 | $90.00 | Strip debris (about 4.1 cu yd at 1.5 in.) plus patio spoil (4.8 cu yd). Albany, NY, takes yard waste at $10 a cubic yard (City of Albany); soil fees vary by site. |
| Labor | |||
| 16. Labor, patio | 52 worker-hours x $70.00 | $3,640.00 | Hand crews move 7 to 10 tons of material per person per day (CMHA PAV-TEC-011). The pavers and base alone weigh about 8.6 tons, before the dig, compaction and cuts. |
| 17. Labor, softscape and cleanup | 16 worker-hours x $70.00 | $1,120.00 | Published task rates put topsoil spreading, sod, mulch and planting at about 5 to 9 worker-hours (Utah State University VLE model); the rest is stripping and cleanup. |
| Admin | |||
| 18. Permit | None required in this example | $0.00 | An at-grade patio often needs no permit, but check. Where one is needed, fees are posted: Longview, Texas, charges $100 for a retaining wall (city fee schedule). |
| 19. Utility locate (811) | Request before digging | $0.00 | 811 is a free service (Call 811). It should not appear as a charge. |
| 20. Overhead and profit | Built into the labor rate | $0.00 | $70 sits inside the $58 to $82 billed range that already covers overhead and profit (see the hourly-rate section). A separate O&P line on top of a rate like that deserves a question. |
| Total | $8,733.31 | Patio lines (3 to 7, 16, plus one skid-steer day, one delivery and the spoil fee) come to about $5,760, or $30 per sq ft. |
Three things in that table are worth carrying into any estimate you read. First, every line has a unit (cubic yards, square feet, pallets, each, hours), so you can multiply it out. Second, the description carries the specification: base depth, sand type, plant species and pot size. Third, the numbers reconcile: the stripped area equals the sum of the work areas, and the patio lines land at $30 per sq ft, inside the $29 to $45 range in our paver patio cost breakdown. An estimate that won’t reconcile with itself is usually an estimate built from a round number.
What each section of an estimate should tell you
Demolition and removal
Removal is the line most often missing or vague. It should say what is coming out (turf, shrubs, old pavers, concrete), the area or count, and where it goes. Haul-off and dump fees are real costs; if the estimate says nothing, assume the debris is staying on your property or the cost will turn up later as extra work.
Grading and excavation
Look for a depth and an area. For a paver patio, the paver industry’s construction bulletin sets a minimum compacted base of 4 inches over well-drained soil for patios and walks, with thicker bases on wet or weak soils, plus 1 inch of bedding sand (CMHA PAV-TEC-002). A bid that says “excavate and prepare base” with no depth gives you nothing to hold the contractor to. Finish grading under a new lawn should say how much topsoil, in inches or cubic yards.
Materials: quantity, unit, specification
Every material line needs a quantity, a unit, and enough description that two contractors would buy the same thing: paver product and thickness, stone gradation (crusher run, #57, and so on), mulch type, sod species, plant species and container size. A line reading “plants, $1,200” can be filled with 1-gallon pots or 5-gallon shrubs; 5-gallon plants cost roughly 2.5 to 3.5 times as much as 1-gallon pots on 2026 nursery lists ($26.75 to $99.99 versus $10.75 to $27.99; Nevada Division of Forestry; Corliss Brothers).
Some states turn this into a legal requirement. California home improvement contracts must carry a heading for “Description of the Project and Description of the Significant Materials to be Used and Equipment to be Installed” (Cal. Bus. & Prof. Code 7159(d)(7)). New Jersey and Wisconsin rules require the “type, grade, quality, size or quantity of principal building or construction materials” (N.J.A.C. 13:45A-16.2(a)12; Wis. Admin. Code ATCP 110.05).
Labor
Labor appears in one of three ways: bundled into installed unit prices (“sod, installed, $0.95/sq ft”), as hours times a rate, or as a lump sum per phase. All three are legitimate. What matters is that you can compare like with like across bids. If one bid is time-and-materials (you pay actual hours), the hourly rate must be in writing in New Jersey and Wisconsin (N.J.A.C. 13:45A-16.2; ATCP 110.05(2)(c)), and you carry the risk if the job runs long. Our line-item landscaping cost guide lists installed unit prices you can hold a bundled line against.
Equipment, delivery and disposal
A skid steer, plate compactor and paver saw are normal on a patio job. They may be listed separately or folded into labor. As a yardstick, New York State’s contract rental rate for a small skid steer is $336.11 a day (NY OGS). Delivery is usually per load; disposal is usually per cubic yard or per ton at the receiving site.
Permits and utility locates
Permit rules are local. The International Residential Code exempts retaining walls up to 4 ft, measured from the bottom of the footing, unless they hold back a surcharge such as a driveway (IRC R105.2, quoted in a City of Port Townsend handout). Irrigation work often needs its own permit or backflow inspection. The utility locate before any digging costs you nothing: 811 is free (Call 811).
Overhead and profit
Contractors either fold overhead and profit into their rates or add it as a percentage at the bottom. Neither is a red flag on its own, and no public dataset sets a standard markup for residential landscaping. What you can check is double counting: if the labor rate is already in the range landscaping firms bill (overhead included), a separate 15 or 20 percent O&P line on top deserves an explanation.
How to check the quantities yourself
Almost every bulk quantity on a landscaping estimate comes from one formula: square feet x depth in inches / 324 = cubic yards. It works because a cubic yard is 27 cubic feet and a foot is 12 inches (27 x 12 = 324). Measure the area with a tape, use the depth written on the estimate, and compare. Paver, sod and joint-sand quantities come from the manufacturer’s or seller’s stated coverage.
| Material | Coverage rate | Example: what to expect | Source |
|---|---|---|---|
| Mulch | 1 cu yd covers 324 sq ft at 1 in., 108 sq ft at 3 in. | 300 sq ft bed at 3 in. = 2.8 cu yd | UF/IFAS Gardening Solutions |
| Topsoil or compost | sq ft x inches / 324 | 400 sq ft at 4 in. = 4.9 cu yd | Arithmetic; depth comes from the estimate |
| Crusher run base | 1 cu yd (about 2,700 lb) covers about 100 sq ft at 2 in. | 211 sq ft at 4 in. = 4.2 cu yd, about 5.7 tons | Cummin Landscape Supply |
| Bedding sand | 1 cu yd per 324 sq ft at 1 in. | 192 sq ft = 0.6 cu yd | CMHA PAV-TEC-002 (1 in. depth) |
| Concrete pavers, 60 mm Holland | 120 sq ft per pallet, about 3,120 lb | 192 sq ft = 1.6 pallets | Cummin product page |
| Polymeric sand | 65 to 85 sq ft per 50 lb bag, narrow joints | 192 sq ft = 2.3 to 3.0 bags | Alliance Gator Maxx G2 spec |
| Sod | 450 sq ft per pallet (varies by farm) | 400 sq ft lawn = 1 pallet | Texas Garden Materials |
| Excavation spoil | area x total section depth / 324 | 211 sq ft x 7.4 in. = 4.8 cu yd | Arithmetic from CMHA section depths |
Two judgment calls sit inside these numbers. A small allowance for cuts and breakage on pavers and sod is normal; a large one (more than a full extra pallet on a small patio) is worth asking about, especially if you are paying for material you will never see. And rounding up to the next whole unit is normal for bulk deliveries, because yards sell bulk material by the cubic yard or ton.
Is $100 an hour too much for landscape work?
Not for a crew. A landscaping and groundskeeping worker earned a median of $18.82 an hour in May 2025 (BLS OEWS, May 2025). Wages were 76.9 percent of total compensation for private-industry service workers in June 2026 (BLS Employer Costs for Employee Compensation, table 4), so that worker costs the employer about $24.47 an hour before trucks, equipment, insurance, overhead and profit.
Landscaping firms took in $3.10 of revenue for every dollar of payroll in 2022 (Census 2022 Economic Census, NAICS 561730). Applied to the median wage, and cross-checked against revenue per paid hour adjusted for wage growth through 2025 (BLS CES average hourly earnings), that supports a billed rate of roughly $58 to $82 per worker-hour, the range our landscaping cost guide builds in detail. So $100 an hour for a two-person crew is $50 a head, below that range. For one person it is above average but not unusual in high-wage states or for design, stonework or lighting; one Kansas nursery publishes $110 an hour per person (Blueville Nursery 2026 catalog). Our landscaper salary data shows how wages vary by state.
The more useful question on an estimate is how many hours. Divide the labor line by the rate and compare it with the scope. If you are curious how contractors build those numbers from the other side of the table, our guide to bidding landscaping jobs walks through it.
Deposits and payment schedules: what state law actually caps
Payment terms are where an estimate turns into a contract, and some states regulate them directly. The rules below apply only where the state’s home improvement law covers landscaping, which our state licensing dataset checks state by state. In that 50-state review, home improvement rules name landscaping in Arkansas, California, Connecticut, Maryland, New Jersey, Pennsylvania (hardscape only for state-certified landscapers), Tennessee (nine counties) and Wisconsin. The table covers the five states whose contract, payment and cancellation text we read in full, plus the federal rule that applies everywhere.
| State | Covers landscaping? | Written contract | Deposit limit | Right to cancel | Change orders |
|---|---|---|---|---|---|
| California | Yes, “landscaping” is named (B&P 7151) | Required above $500 (B&P 7159(b)) | $1,000 or 10%, whichever is less; later payments may not exceed work done or materials delivered (B&P 7159.5) | 3 business days; 5 if the buyer is 65 or older (Civ. Code 1689.6; 1689.5) | Written and signed before the extra work starts (7159(d)(13)) |
| Connecticut | Yes, when the total exceeds $200 (CGS 20-419) | Not valid or enforceable against the owner unless written and signed (CGS 20-429) | No percentage cap found in ch. 400 | 3 business days; every home improvement contract is treated as a home solicitation sale (CGS 42-137; 20-429(e)) | Each change in writing and signed (20-429(a)(1)(B)) |
| Maryland | Yes, landscaping on land adjacent to the home (BR 8-101) | Required, with license number and start and completion dates (BR 8-501) | No payment before signing; deposit no more than 1/3 of the price (BR 8-617) | FTC rule if sold at your home | A salesperson may not change the contract (8-501(e)) |
| New Jersey | Yes, under the consumer rule’s definition (N.J.A.C. 13:45A-17.2) | Required above $500 (N.J.S.A. 56:8-151) | No percentage cap in the act | 3 business days after receiving a copy, wherever signed; refund within 30 days (56:8-151(b)) | All changes in writing (13:45A-16.2(a)12) |
| Wisconsin | Yes (ATCP 110.01) | Required if you pay anything before completion or the seller solicited you (ATCP 110.05) | No percentage cap in ATCP 110 | FTC rule if sold at your home | Changes in writing (110.05(1)) |
| All states (federal) | Consumer services sold at your home | Copy of contract at signing | None | 3 business days for sales of $25+ at your home, even if you invited the seller (16 CFR 429) | Not addressed |
California’s rule is the strictest and the most specific, so it is the one to use as a benchmark even if you live elsewhere. On the sample estimate above ($8,733.31), the most a California contractor could take at signing is $873.33, because 10 percent is less than $1,000. Every later payment has to track work actually done or materials actually delivered (B&P 7159.5(a)(5)); the contract has to say so in 12-point bold: “IT IS AGAINST THE LAW FOR A CONTRACTOR TO COLLECT PAYMENT FOR WORK NOT YET COMPLETED, OR FOR MATERIALS NOT YET DELIVERED” (B&P 7159(d)(9)). The one exception is a contractor who furnishes a performance and payment bond or approved joint control (7159.5(a)(8)). Violating the down payment or advance payment rules is a misdemeanor in California, with fines of $100 to $5,000 (7159.5(b)).
| Milestone | Payment | Paid to date | Value delivered by then (approx.) |
|---|---|---|---|
| Contract signed (down payment) | $873.33 | $873.33 | $0; the down payment is the only allowed advance |
| Lawn stripped, patio dug, base compacted, all materials on site | $4,000.00 | $4,873.33 | About $5,300: materials $2,986, delivery and dump fees $315, 1 skid-steer day, about 24 worker-hours |
| Pavers laid, restrained and sanded | $2,000.00 | $6,873.33 | About $8,000: everything except the sod and bed labor |
| Sod, beds and final walk-through done; lien releases in hand | $1,859.98 | $8,733.31 | $8,733.31 |
Where no statute caps the deposit, the California logic is still a sensible test: a deposit large enough to buy all the materials, paid before anything is ordered, leaves you as the project’s lender. A contractor buying a few thousand dollars of pavers may reasonably ask for the materials cost up front; that should be visible on the estimate as a materials line, not a round percentage.
Your right to cancel after signing
If a landscaping contract of $25 or more is signed at your home, the federal Cooling-Off Rule gives you until midnight of the third business day to cancel for a full refund. It applies even when you invited the salesperson over (16 CFR 429.0; FTC consumer guidance). The seller must give you two copies of a cancellation form and tell you about the right out loud; Saturdays count as business days, Sundays and federal holidays do not. If you cancel, the seller has 10 business days to refund you (16 CFR 429.1(g)).
The federal rule does not cover a deal you finalized at the contractor’s permanent place of business, a sale made entirely by phone or online, or a genuine emergency you initiated and waived in writing (16 CFR 429.0). State law often goes further:
- California: three business days, or five if the buyer is 65 or older, counted from when you receive a signed and dated copy that includes the notice (Civ. Code 1689.6). The contractor must refund within 10 days of your notice (B&P 7159(e)(6)).
- New Jersey: three business days after you receive a copy of any home improvement contract, for any reason, with a refund due within 30 days (N.J.S.A. 56:8-151(b)).
- Connecticut: every home improvement contract is a home solicitation sale “regardless of the location of the transaction,” so the three-day right applies even at the contractor’s office (CGS 20-429(e); 42-137).
A contract that should carry a cancellation notice and does not is itself a problem. In Connecticut, a home improvement contract is not enforceable against the owner without one (CGS 20-429(a)(1)(A)(vi)).
Change orders, warranties and the fine print
Change orders
Landscaping jobs change once the ground is open: buried concrete, a drainage problem, a plant that is out of stock. The protection is the same everywhere: the change goes on paper, with the added or subtracted cost and the effect on the schedule, signed before the work is done. California spells this out on every contract (B&P 7159(d)(13)); Connecticut, New Jersey and Wisconsin require changes in writing (CGS 20-429; N.J.A.C. 13:45A-16.2; ATCP 110.05). A good estimate also says what happens with unknowns, for example a per-cubic-yard price for removing buried debris or rock, so the change order is arithmetic rather than a negotiation.
Warranties
None of the state rules we read requires a landscaper to warranty plants or workmanship; the terms are whatever the contract says. What New Jersey and Wisconsin do require is that any warranty offered be written into the contract (N.J.A.C. 13:45A-16.2(a)12.vi; ATCP 110.05(2)(f)). Read a plant warranty for three things: how long it runs, who is responsible for watering and whether underwatering voids the coverage, and whether replacement includes the labor to replant.
Exclusions, validity and substitutions
The exclusions list is as important as the line items. Irrigation repairs, sprinkler relocation, drainage, permit fees, tree work and haul-off are the usual candidates. Check also how long the price holds and what the contract allows if a specified material or plant is unavailable; “or equal” substitutions should require your sign-off.
Mechanics’ liens: the risk that never shows up as a line item
If your contractor does not pay the stone yard or the nursery, the supplier may be able to record a lien on your property even though you paid the contractor in full. California makes contractors print this warning in every home improvement contract: “Even if you pay your contractor in full, unpaid subcontractors, suppliers, and laborers who helped to improve your property may record mechanics liens and sue you in court to foreclose the lien” (B&P 7159(e)(4)).
The paperwork that protects you:
- Preliminary notices. In California, subcontractors and suppliers must send you a preliminary notice to preserve lien rights, and it can arrive up to 20 days after they start work or deliver materials (Civ. Code 8200; B&P 7159(e)(4)). Keep every one you receive.
- Lien releases with each payment. A California contract must state that the contractor will furnish a full and unconditional release for the work paid for before any further payment, and you may withhold further payments until it does (7159(c)(4); 7159.5(a)(6)). The statutory release forms begin at Civ. Code 8132 (conditional waiver on progress payment); conditional releases only take effect once the check clears.
- Waivers from suppliers, not only the contractor. In Wisconsin, if you ask, the contractor must give you written lien waivers from all contractors, subcontractors and material suppliers in proportion to each partial payment, and must tell you before signing that you are entitled to them (ATCP 110.02(6)(m) and (n)).
- Joint checks. California’s mandated warning suggests paying with a check made out to both the contractor and the supplier who sent a preliminary notice (B&P 7159(e)(4)).
Lien windows are short but not instant. A California direct contractor must record its lien within 90 days after completion, or 60 days after the owner records a notice of completion (Civ. Code 8412). Other states set different deadlines; ask the contractor which suppliers are on your job, and hold the final payment until you have releases for them.
Comparing two or three estimates
Put the bids side by side and normalize them before you compare totals:
- Same scope: the same areas, the same depths, the same plant counts and sizes. Rewrite a vague bid’s lines in the units of the most detailed one and ask the vague bidder to confirm.
- Same specification: paver product and thickness, base depth, sod species, plant container size. A lower bid on 1-gallon plants is a different yard, not a discount.
- Same exclusions: a bid that leaves out haul-off, permits or irrigation repair is not cheaper until those are added back.
- Same terms: deposit, payment milestones, warranty length and lien releases.
- A checked license: in states that license landscapers, the license number belongs on the contract (California, Connecticut, Maryland and New Jersey require it). Our guide to checking a landscaper’s license links the official lookups. California also lets an unlicensed person do only minor work under $1,000 that needs no building permit and uses no employees (CSLB bulletin on AB 2622).
A bid far below the others usually means missing scope, a thinner base or smaller plants. A bid far above usually means a different specification or a contractor who does not want the job. The estimate itself, read line by line, tells you which.
How we built the sample estimate
Quantities: areas from the hypothetical plan (patio 12 x 16 ft, bed 300 sq ft, lawn 400 sq ft); depths from CMHA PAV-TEC-002 (4 in. base, 1 in. sand) and common specifications (3 in. mulch, 4 in. topsoil); cubic yards = sq ft x inches / 324. Base area = (12 ft + 8 in.) x (16 ft + 8 in.) = 211 sq ft per the base-extension rule in PAV-TEC-003. Patio section depth = 2.375 + 1 + 4 = 7.4 in. Strip debris assumes a 1.5 in. cut (892 x 1.5 / 324 = 4.1 cu yd); that depth is our assumption for the illustration.
Prices: the linked 2026 supply-yard, county and state contract prices, unmarked. Plant unit prices ($45 per 5-gallon, $15 per 1-gallon) were set inside the 2026 nursery-list ranges cited, not taken from one list. Labor: $70 per worker-hour, inside a $58 to $82 range built as the BLS OEWS May 2025 median wage for SOC 37-3011 ($18.82) x the 2022 Economic Census revenue-to-payroll ratio for NAICS 561730 (3.095) at the low end, and 2022 revenue per employee divided by paid hours, scaled by CES wage growth to 2025, at the high end. Hours: softscape from Utah State University VLE task rates (topsoil 3 to 7 cu yd/hr by skid steer, sod 250 to 550 sq ft/hr, mulch 125 to 165 sq ft/hr, 14 to 20 one-gallon and 5 to 9 five-gallon plants/hr), rounded up for stripping and cleanup; patio hours were set so the patio lands at $30 per sq ft, inside the $29 to $45 per sq ft range in our paver patio cost build, and checked against CMHA’s 7 to 10 tons per person per day for hand installation. These are illustrations, not quotes; your local prices will differ.
Law: statute and regulation text was read on the linked pages in October 2026. California statutes were read on california.public.law copies because leginfo.legislature.ca.gov blocked automated access. We could not retrieve Pennsylvania’s Home Improvement Consumer Protection Act text from the Legislature’s site during research, so Pennsylvania’s contract and deposit rules are not summarized here.
This page is general information, not legal advice. Home improvement contract, cancellation and lien rules differ by state and change; confirm with your state’s contractor board or attorney general’s consumer protection office, or a lawyer, before you sign or withhold payment.
Questions homeowners ask about landscaping estimates
What should a landscaping contract include?
At minimum: the contractor’s name, address and license or registration number; a description of the work with materials named by type, size and quantity; the total price; start and completion dates; the payment schedule; how change orders work; any warranty; and a notice of your cancellation rights. California, Connecticut, Maryland, New Jersey and Wisconsin put most of these in statute or regulation for home improvement work that includes landscaping.
What does a landscaping quote breakdown look like?
A useful breakdown groups lines into site prep and demolition, hardscape materials, softscape materials, logistics (delivery, equipment, disposal), labor, and permits, each with a quantity, a unit and a unit price. The sample estimate on this page shows all six groups for an $8,733 backyard job.
How much deposit should a landscaper ask for?
In California, no more than $1,000 or 10 percent of the contract price, whichever is less, unless the contractor posts a qualifying bond. In Maryland the cap is one-third of the price. Elsewhere it is negotiable; a deposit tied to the cost of materials being ordered for your job is easier to justify than a flat 50 percent.
Can I cancel a landscaping contract after I sign it?
Usually within three business days if you signed at home and the price was $25 or more, under the FTC Cooling-Off Rule. New Jersey and Connecticut give three business days wherever you signed; California gives three, or five for buyers 65 and older. After that window, cancellation depends on the contract’s terms.
How do I check an estimate against my landscape plan?
Use the plan’s plant schedule (the legend listing each species, size and count) and its dimensions. Every plant on the schedule should appear on the estimate at the same size and count, and the hardscape areas on the estimate should match the plan’s dimensions multiplied out. Differences are either scope changes or mistakes; ask which.
What is the 3-5-7 rule in landscaping?
It is a planting-design rule of thumb, usually describing plants set in odd-numbered groups such as 3, 5 or 7 for a natural look. It is not a pricing or contract standard. On an estimate, what matters is that the plant counts match your plan, whatever grouping the designer used.
Sources
- California Legislature (via california.public.law), Business and Professions Code 7159, home improvement contract requirements, current text, verified by publisher Oct. 2026. Accessed October 2026.
- California Legislature (via california.public.law), Business and Professions Code 7159.5, down payment and progress payment limits, updated Jan. 1, 2024. Accessed October 2026.
- California Legislature (via california.public.law), Business and Professions Code 7151, definition of home improvement, updated Jan. 1, 2022. Accessed October 2026.
- California Legislature (via california.public.law), Civil Code 1689.6, right to cancel home solicitation contracts, current text. Accessed October 2026.
- California Legislature (via california.public.law), Civil Code 1689.5, definitions (business day, senior citizen), current text. Accessed October 2026.
- California Legislature (via california.public.law), Civil Code 8200, preliminary notice, current text. Accessed October 2026.
- California Legislature (via california.public.law), Civil Code 8412, direct contractor lien deadline, current text. Accessed October 2026.
- California Legislature (via california.public.law), Civil Code 8132, conditional waiver and release on progress payment, current text. Accessed October 2026.
- California Contractors State License Board, Industry bulletin: AB 2622 implementation (minor work exemption raised to $1,000), 2024, effective Jan. 1, 2025. Accessed October 2026.
- Federal Trade Commission (eCFR), 16 CFR Part 429, Rule Concerning Cooling-Off Period for Sales Made at Homes or at Certain Other Locations, current through October 2026. Accessed October 2026.
- Federal Trade Commission, Buyer’s Remorse: The FTC’s Cooling-Off Rule May Help, current as of October 2026. Accessed October 2026.
- Maryland General Assembly, Business Regulation 8-101, definitions (home improvement), current text. Accessed October 2026.
- Maryland General Assembly, Business Regulation 8-501, home improvement contract requirements, current text. Accessed October 2026.
- Maryland General Assembly, Business Regulation 8-617, payments and deposits, current text. Accessed October 2026.
- Connecticut General Assembly, General Statutes Chapter 400, Home Improvement Act (20-419, 20-429), 2026 revision. Accessed October 2026.
- Connecticut General Assembly, General Statutes Chapter 740, Home Solicitation Sales (42-135a, 42-137), 2026 revision. Accessed October 2026.
- State of New Jersey, Contractors’ Registration Act, N.J.S.A. 56:8-136 et seq. (56:8-151), as amended 2004. Accessed October 2026.
- New Jersey Administrative Code (via Cornell LII), N.J.A.C. 13:45A-16.2, home improvement unlawful practices and contract requirements, current text. Accessed October 2026.
- New Jersey Administrative Code (via Cornell LII), N.J.A.C. 13:45A-17.2, definitions (home improvement), current text. Accessed October 2026.
- Wisconsin Administrative Code (via Cornell LII), ATCP 110.01, definitions, current text. Accessed October 2026.
- Wisconsin Administrative Code (via Cornell LII), ATCP 110.02, prohibited trade practices (lien waivers), current text. Accessed October 2026.
- Wisconsin Administrative Code (via Cornell LII), ATCP 110.05, home improvement contract requirements, current text. Accessed October 2026.
- UF/IFAS Gardening Solutions, Mulch, undated. Accessed October 2026.
- Clemson Cooperative Extension, HGIC 1604, Mulch, revised June 2016. Accessed October 2026.
- Concrete Masonry and Hardscapes Association, PAV-TEC-002, Construction of Interlocking Concrete Pavements, revised 2022. Accessed October 2026.
- Concrete Masonry and Hardscapes Association, PAV-TEC-003, Edge Restraints for Interlocking Concrete Pavements, revised 2022. Accessed October 2026.
- Concrete Masonry and Hardscapes Association, PAV-TEC-011, Mechanical Installation of Interlocking Concrete Pavements, current edition. Accessed October 2026.
- Cummin Landscape Supply, Holland Stone 60mm pavers, pallet price, coverage and weight, price checked October 2026. Accessed October 2026.
- Cummin Landscape Supply, Gravel and sand products (crusher run price and coverage), price checked October 2026. Accessed October 2026.
- Cummin Landscape Supply, Accessories (Paver Rail Flex, spikes), price checked October 2026. Accessed October 2026.
- Cummin Landscape Supply, Pavermate polymeric sand, 50 lb, price checked October 2026. Accessed October 2026.
- Alliance Gator, Gator Maxx G2 polymeric sand coverage, accessed October 2026. Accessed October 2026.
- Texas Garden Materials, St. Augustine ‘Raleigh’, 450 sq ft pallet, price checked October 2026. Accessed October 2026.
- Texas Garden Materials, Torpedo sand, per cubic yard, price checked October 2026. Accessed October 2026.
- MK Landscape Supply, 2026 price list, 2026. Accessed October 2026.
- USDA Agricultural Marketing Service, National Quarterly Sod Report, April to June 2026. Accessed October 2026.
- Orange County, NC, Mulch and compost (delivery charges), checked October 2026. Accessed October 2026.
- City of Albany, NY, Compost facility (yard waste fee), 2026 season. Accessed October 2026.
- New York State Office of General Services, Contract 72007-23182 price list (skid steer daily rate), effective Jan. 5, 2024. Accessed October 2026.
- Common Ground Alliance / Call 811, 811 before you dig, accessed October 2026. Accessed October 2026.
- U.S. Bureau of Labor Statistics, Occupational Employment and Wages, May 2025: Landscaping and Groundskeeping Workers (37-3011), May 2025. Accessed October 2026.
- U.S. Bureau of Labor Statistics, Employer Costs for Employee Compensation, Table 4, private industry, June 2026. Accessed October 2026.
- U.S. Census Bureau, 2022 Economic Census, EC2256BASIC (NAICS 561730 Landscaping Services), 2022. Accessed October 2026.
- U.S. Bureau of Labor Statistics, CES series CEU6056173003, average hourly earnings, landscaping services, 2022 and 2025 annual averages. Accessed October 2026.
- Utah State University / HydroShare, Value Landscape Engineering model data files (task-rate database), model data 2009, published 2011. Accessed October 2026.
- City of Longview, TX, Development Services Fees, 2025-2026. Accessed October 2026.
- City of Port Townsend, WA, Retaining walls information handout (IRC R105.2), revised March 2024. Accessed October 2026.
- Nevada Division of Forestry, 2026 Las Vegas nursery spring plant list, February 2026. Accessed October 2026.
- Corliss Brothers, 2026 retail catalog, 2026. Accessed October 2026.
- Blueville Nursery, 2026 plant catalog and install pricing, 2026. Accessed October 2026.